| Brand Name: | QIHAI |
| Model Number: | QH-GC3-H |
| MOQ: | 1 Set |
| Price: | Negotiable |
| Payment Terms: | T/T |
| Supply Ability: | 100 Set/month |
Core Structure & Loading: Side-mounted lathe (prevents 11500-12500mm tube sagging); fully-automatic loading (no manual lifting, cuts loading time by 60%).
Key Specs: Φ15-580mm round/15×15-580×580mm square tubes; 6000W-20KW laser power; ±0.03mm positioning accuracy; 20T machine weight.
Fit: Wind power/oil & gas industries; handles long
| Model | QH-GC3-H |
|---|---|
| Cutting Diameter | Round Tube: Φ15-580mm Square Tube: 15*15mm to 580*580mm |
| Tube Length Capacity | 11500-12500mm |
| Machine Weight | 20T |
| Dimensions (L*W*H) | 22200*5350*2650mm |
| Laser Power Range | 6000W-20KW |
| Positioning Accuracy | ±0.03mm (X/Y-axis) |
| Repositioning Accuracy | ±0.03mm (X/Y-axis) |
| Compatible Tube Types | Round Tube / Square Tube |
Side-mounted Lathe Ensures Long-tube Processing Stability: The side-mounted layout supports 11500-12500mm long tubes horizontally from the side, eliminating mid-span sagging that causes uneven cuts or bevel angles (common in vertical lathes). This maintains ±0.03mm positioning accuracy and consistent bevel angles (e.g., 45° deviation ≤±0.5°) across the entire tube length, reducing weld joint rework rates by 50%-60%—vital for pressure-bearing pipelines where precision impacts safety.
Fully-automatic Loading Cuts Labor & Boosts Efficiency: The automated loading system handles heavy tubes (up to Φ580mm) without manual intervention—automatically completing tube feeding, centering, and 3-chuck clamping in 2-3 minutes (vs. 5-8 minutes manually). For batch production (e.g., 100pcs 12m-long Φ500mm tubes), this reduces total production time by 30%-35% and eliminates labor injuries from heavy lifting, lowering operational costs.
Synergy of Side-mounted Design & 3-Chuck Clamping for Large Tubes: The side-mounted lathe’s stable tube support pairs with the 3-chuck system to evenly distribute clamping force on large-diameter tubes (e.g., 580×580mm square tubes). This prevents tube rotation or deformation during high-power (20KW) cutting, ensuring smooth, dimensionally accurate edges. Combined with fully-automatic loading, the machine achieves seamless “load-cut-unload” cycles, minimizing downtime and maximizing throughput for heavy-tube manufacturing.